TEMPLAR House
![](https://harvestconstruction.ie/wp-content/uploads/2024/01/templar-main-1024x683.jpg)
This was a complete design and build project by Harvest Construction. The build was taken from greenfield site to turn key finish less than 6 months from commencement on site. All works including site clearing, groundworks, structures and interiors were completed by the Harvest Construction Team.
GROUNDWORKS AND MAIN STRUCTURE:
Site Clearance, Foundations, Drainage and Subfloors, Rising Walls, Cavity Insulation, Floor Joists, Roof Structure.
FIRST FIX:
Carpentry, Electrical, and Plumbing First Fix, Heating, Slabbing, Skimming, Window fitting of preferred window spec including UPVC, Aluclad and Lumi.
SECOND FIX:
Electrical and Plumbing Second Fix, Doors, Floors, Skirting, Architrave, Heat Pump, Kitchen Fit-Out, Bathroom Fixtures and Fittings.
![1 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/1-2.jpg)
![2 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/2-2.jpg)
![3 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/3-2.jpg)
![4 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/4-2.jpg)
![5 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/5-2.jpg)
![6 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/6-2-1.jpg)
![7 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/7-2.jpg)
![8 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/8-2.jpg)
![9 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/9-2.jpg)
![10 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/10-2.jpg)
![11 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/11-2.jpg)
![12 (2)](https://harvestconstruction.ie/wp-content/uploads/2024/01/12-2.jpg)