Ellen's CourtRush Co.Dublin

Ellens Cove saw the construction of two terraced and four semi-detached A-rated homes. All of the construction from groundworks to completion was overseen by the team at Harvest Construction. The entire project was completed in 12 months including interiors.

Before Renovation Works

Gallery Thumb 1 Gallery Thumb 2 Gallery Thumb 3 Gallery Thumb 4 Gallery Thumb 5 Gallery Thumb 6 Gallery Thumb 7 Gallery Thumb 8 Gallery Thumb 9 Gallery Thumb 10 Gallery Thumb 11 Gallery Thumb 12

Walkthrough Video

After Renovation Works

Gallery Thumb 1 Gallery Thumb 2 Gallery Thumb 3 Gallery Thumb 4 Gallery Thumb 5 Gallery Thumb 6 Gallery Thumb 7 Gallery Thumb 8 Gallery Thumb 9 Gallery Thumb 10 Gallery Thumb 11 Gallery Thumb 12

Groundworks and Main Structure:

Site Clearance, Foundations, Drainage and Subfloors, Rising Walls, Cavity Insulation, Floor Joists, Roof Structure

First Fix:

Carpentry, Electrical, and Plumbing first fix, Heating, Slabbing, Skimming, Window fitting of preferred window spec including UPVC, aluclad and Lumi

Second Fix:

Electrical and plumbing second fix, doors, floors, skirting, architrave, heat pump, kitchen fit out, bathroom fixtures and fittings